Asbestos Insulation Board.

Heston's Environmental carried out multiple enclosure's for the safe removal of asbestos insulation board to risers and asbestos insulation board boxing above a staircase. Work was carried out under fully controlled conditions.

Thermal Insulation to pipework.

Heston's Environmental carried out the safe removal of thermal insulation (hard set) to redundant pipework. The pipe was wrapped with 1000 gauge visqueen, this was then injected with fibre suppressant using surfactant and water at a Dilution factor of 1:10. Using straight needles fed through a injection system.

Once all pipework had been safely removed, Heston's carried out a full environmental clean of the floor void. These works were  carried out under fully controlled conditions.

 

Asbestos cement Sheets

Heston's Environmental carried out the safe removal of asbestos cement sheets to the out building. New timber joists were installed along with new aluminum corrugated sheets. These works were carried out under semi controlled conditions.

AIB Ceiling Tiles

Heston's Environmental carried out the safe removal of a Asbestos insulation Board ceiling, within a residential property. These works were carried out under fully controlled conditions.

 

Removal of thermal insulation debris & flaking paint.

Heston's Environmental carried out the removal of thermal insulation debris to a wall and flaking paint to the boiler room. 

Once all removed the wall was encapsulated with white ET-150 Paint. These works were carried out under fully controlled conditions.